Time, cost, and architecture / George T. Heery

By: Heery, George T [author]Material type: TextTextPublication details: New York : McGraw-Hill, c1975Description: viii, 212 pages : illustrations ; 25 cmISBN: 0070278156Subject(s): BUILDING -- COST CONTROL | CONSTRUCTION INDUSTRY -- MANAGEMENTLOC classification: TH 437 .H44 1975
Contents:
Preface -- 1. New directions in design with construction management: fourteen case histories -- 2. A management approach to the construction program -- 3. The owner -- 4. Introduction to the time/cost control system -- 5. Predesign project analysis -- 6. Systems approach to design -- 7. A cost-control system -- 8. Time control, contract time provisions, and contract time-extension rulings -- 9. Productive use of the critical path method and other computer-assisted scheduling techniques -- 10. Phased, separate, and transferable contracts -- 11. Bid and negotiations management -- 12. Construction management in the construction phase -- Index.
Summary: This book describes a definitive system for time and cost control that may be applied within any given program of requirements, quality level, or design goal. The system has been used effectively on many projects of varying size and type, for private and governmental owners, and in various areas of the United States and abroad, including some of the most difficult of construction markets.
Item type: Books
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current library Home library Collection Shelving location Call number Copy number Status Date due Barcode
Books Books LRC - Architecture
National University - Manila
Architecture General Circulation GC TH 437 .H44 1975 (Browse shelf (Opens below)) c.1 Available NULIB000017604

Includes index.

Preface -- 1. New directions in design with construction management: fourteen case histories -- 2. A management approach to the construction program -- 3. The owner -- 4. Introduction to the time/cost control system -- 5. Predesign project analysis -- 6. Systems approach to design -- 7. A cost-control system -- 8. Time control, contract time provisions, and contract time-extension rulings -- 9. Productive use of the critical path method and other computer-assisted scheduling techniques -- 10. Phased, separate, and transferable contracts -- 11. Bid and negotiations management -- 12. Construction management in the construction phase -- Index.

This book describes a definitive system for time and cost control that may be applied within any given program of requirements, quality level, or design goal. The system has been used effectively on many projects of varying size and type, for private and governmental owners, and in various areas of the United States and abroad, including some of the most difficult of construction markets.

There are no comments on this title.

to post a comment.

© 2021 NU LRC. All rights reserved.Privacy Policy I Powered by: KOHA