Maximum Security Regional Prison House / Adrian G. Rotoni

By: Material type: TextTextPublication details: Manila : National University, 2018Description: viii, 114 leaves : color illustrations, maps, plans ; 30 cmLOC classification:
  • UGT COA BSArch .R68 2018
Contents:
Acknowledgement -- Certificate of endorsement -- Approval sheet -- Table of contents -- List of tables -- List of figures -- List of graphs -- Abstract -- Chapter 1. The problem and its setting -- Chapter 2. Review of Related literature -- Chapter 3. Research methodology -- Chapter 4. Data gathering, collation and analysis data -- Chapter 5. Design development -- Chapter 6. Schematics -- Bibliography -- Appendices.
Summary: Today, all of the prisons operated by the Bureau of Corrections managed by Bureau of Jail and Management are congested, with the New Bilibid Prison over populated by 134% of its designed capacity. The DOJ and BuCor is planning to construct a new correctional facility in General Tinio Nueva Ecija. General Tinio is a small urban center in an otherwise rural setting. The government plan to develop a new correctional facility and relocate the prisoners to this new rural site in General Tinio.
Item type: Thesis
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Collection Call number Copy number Status Date due Barcode
Thesis Thesis National University - Manila LRC - Architecture Thesis Architecture UGT COA BSArch .R68 2018 (Browse shelf(Opens below)) c.1 Available UGTHE000001296

Includes bibliographical references.

Acknowledgement -- Certificate of endorsement -- Approval sheet -- Table of contents -- List of tables -- List of figures -- List of graphs -- Abstract -- Chapter 1. The problem and its setting -- Chapter 2. Review of Related literature -- Chapter 3. Research methodology -- Chapter 4. Data gathering, collation and analysis data -- Chapter 5. Design development -- Chapter 6. Schematics -- Bibliography -- Appendices.

Today, all of the prisons operated by the Bureau of Corrections managed by Bureau of Jail and Management are congested, with the New Bilibid Prison over populated by 134% of its designed capacity. The DOJ and BuCor is planning to construct a new correctional facility in General Tinio Nueva Ecija. General Tinio is a small urban center in an otherwise rural setting. The government plan to develop a new correctional facility and relocate the prisoners to this new rural site in General Tinio.

There are no comments on this title.

to post a comment.