New Calamba gateway : proposed integrated terminal hub / Jennina Santi C. Valdueza
Material type:
- UGT COA BSArch .V35 2016

Item type | Current library | Home library | Collection | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|---|
![]() |
National University - Manila | LRC - Architecture Thesis | Architecture | UGT COA BSArch .V35 2016 c.2 (Browse shelf(Opens below)) | c.2 | Available | UGTHE000001953 |
Includes bibliographical references.
Title page -- Acknowledgement -- Certificate of endorsement -- Approval sheet -- Table of contents -- List of tables -- List of figures -- List of graphs -- Abstract -- Chapter I. The problem and its setting -- Chapter II. Research methodology -- Chapter III. Related literature, case studies and conceptual framework -- Chapter IV. Data gathering, collation and analysis of data -- Chapter V. Design framework -- Chapter VI. Translation -- Bibliography -- Appendices.
The integration of the train station with the other modes of transportation creates the project to be called as New Calamba Gateway: Proposed Integrated Terminal Hub. The terminus of Metro line coming from Tutuban is provided with a structure to pave way in the commuters' need of a transport hub where they could have convenient and diverse ride choice. With this study, it will be able to improve transport service to commuters and introduce an interesting transportation look to encourage more train riders. It will contribute in the solution of Calamba traffic situation. Also, the study aims of giving development to the people, helping to enhance the life of the people with the new terminal hub in Calamba.
There are no comments on this title.