Construction performance control by networks / H. N. Ahuja
Material type:

Item type | Current library | Home library | Collection | Shelving location | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|---|---|
![]() |
LRC - Annex | National University - Manila | Gen. Ed. - COE | Relegation Room | GC HD 9715.A2 .A38 1976 (Browse shelf (Opens below)) | Available | NULIB000005694 |
Includes index.
Part I. Problem Definition -- Part II. Alternatives -- Part III. Feasibility -- Part IV. Optimization -- Part V. Implementation -- Part VI. A Case Study.
The Critical Path Method (CPM), which has been used by project planners to plan construction projects, is considered as a tool in system design. Having recognized other needs, such as minimizing costs, maximizing profits, or minimizing project duration, some planners have developed specific procedures based on network planning methods.
There are no comments on this title.