000 01797nam a2200193Ia 4500
003 NULRC
005 20250725162635.0
008 250725s9999 xx 000 0 und d
040 _clcc
050 _aUGT COA BSArch .V35 2016
100 _aValdueza, Jennina Santi C.
_eauthor
245 0 _aNew Calamba gateway :
_bproposed integrated terminal hub /
_cJennina Santi C. Valdueza
260 _aManila :
_bNational University,
_c2016
300 _avii, 166 leaves :
_bcolor illustrations, maps, plans ;
_c30 cm.
504 _aIncludes bibliographical references.
505 _aTitle page -- Acknowledgement -- Certificate of endorsement -- Approval sheet -- Table of contents -- List of tables -- List of figures -- List of graphs -- Abstract -- Chapter I. The problem and its setting -- Chapter II. Research methodology -- Chapter III. Related literature, case studies and conceptual framework -- Chapter IV. Data gathering, collation and analysis of data -- Chapter V. Design framework -- Chapter VI. Translation -- Bibliography -- Appendices.
520 _aThe integration of the train station with the other modes of transportation creates the project to be called as New Calamba Gateway: Proposed Integrated Terminal Hub. The terminus of Metro line coming from Tutuban is provided with a structure to pave way in the commuters' need of a transport hub where they could have convenient and diverse ride choice. With this study, it will be able to improve transport service to commuters and introduce an interesting transportation look to encourage more train riders. It will contribute in the solution of Calamba traffic situation. Also, the study aims of giving development to the people, helping to enhance the life of the people with the new terminal hub in Calamba.
942 _2lcc
_cTHESIS
999 _c24714
_d24714