000 | 01365nam a2200217Ia 4500 | ||
---|---|---|---|
003 | NULRC | ||
005 | 20250725162650.0 | ||
008 | 250725s9999 xx 000 0 und d | ||
040 | _clcc | ||
050 | _aUGT CCIT BSIT .S86 2014 | ||
100 |
_aSunga, Jan Ryan L. _eauthor |
||
245 | 0 |
_aOnline project cost estimation for purabuilt metals with 3d cad generator and DSS / _cJan Ryan L. Sunga, Edward C. Marinas, Mark John Fausto and Joel D. Pagal Jr. |
|
260 |
_aManila : _bNational University, _c2014 |
||
300 |
_axv, 133 leaves ; _c28 cm. |
||
500 | _aResearch Design : Descriptive Method | ||
504 | _aIncludes bibliographical references. | ||
505 | _aChapter 1. Introduction -- Chapter 2. Review of Related Literatures and studies -- Chapter 3. Methodology -- Chapter 4. System Presentation -- Chapter 5. Design, Implementation and Issues -- Chapter 6. Presentation of findings and analysis -- Chapter 7. Summary, Conclusions and Recommendations. | ||
520 | _aCurrently the Purabuilt Metals Company has no project cost estimation system that can be used for their daily transaction and operations using manual operation. The main objective was to develop a cost estimation project for their daily operation within their business. | ||
700 |
_aMarinas, Edward C.;Fausto, Mark John;Pagal, Joel D. Jr. _eco-author;co-author;co-author |
||
942 |
_2lcc _cTHESIS |
||
999 |
_c25073 _d25073 |